Tubing Hanger w. pre-installed TH crown plugs - Installation Experience
Challenge:
An operator in Australia requested the SPS provider to deliver an umbilical-less soluƟon for Tubing Hanger (TH) installation across a multi-well subsea
development project. The request included setup for pre-installed crown
plugs (PICP) and that the TH was mobilized to offshore as “ready-to-run”.
Solution:
Simple Tools proposed a solution utilizing the ADAPT tool in combination
with the existing Tubing Hanger Running Tool (THRT). This approach
enabled a true umbilical-less installation of TH with a proven TH interface.
A key innovation was the integration of Surface Controlled Subsurface
Safety Valve (SCSSV) and Soft-land functionalities. This enabled the SCSSV
to remain open during run-in under the executed operating conditions and
could be reliably closed upon TH landing, meeting critical operational
requirements.
Results
The ADAPT solution led to a significant reduction in red-zone exposure for personnel, enhancing safety throughout the operation. The complexity of a surface flow tree operation was removed from the rig and reduced the POB requirements during the completion phase.
The combination of umbilical-less TH installation and pre-installed crown solution delivered material reductions in rig time across multiple wells.
Conclusion
The operator, rig company and SPS company expressed a high degree of satisfaction with the solution and its documented savings. The project has become a benchmark for future subsea completion campaigns.
Region:
Australia
Tree system:
HXT
Well(s):
3 well campaign
Customer savings:
7.1 rig days total
Avg. 2.38 days per well
Product:
ADAPT
Application:
TH Installation with pre-installed Tubing Hanger Crown Plugs
Benefits:
- Reduced red-zone
- Reduced POB
- Reduced operational time
- Less rental equipment and logistics